Inspection and Maintenance

With long experience, specialised personnel and equipment for the application, inspection, maintenance and repair of bearings, joints and anti-seismic protection devices, ELEMKA has a considerable presence in this field, both in Greece and abroad.

Since 1996, when the first inspection and maintenance project was completed (lifting of the Chalastra overpass bridge in Thessaloniki for replacement of the bearings), the Company has undertaken over 300 technical inspections of all kinds and over 30 projects involving the lifting of structures for repair and replacement of their bearings.

Search Projects

photo_of Attiki Οdos – Metamorfosi Junction (Βranch 5/Μ2)

Attiki Οdos – Metamorfosi Junction (Βranch 5/Μ2)

Location:Metamorfosi, Greece
Construction Period:January 2016 - February 2016
ELEMKA Object:Lifting of superstructure and antilifting bearings replacement (weight +2 ton each)
Owner:MINISTRY OF INFRASTRUCTURE TRANSPORTATION & NETWORKS
Contractor:AKTOR S.A. - J&P – ΑVΑX S.S. ATTIKI ODOS CONSESSION PROJECT J/V
Designer/Consultant:ΟMILOS TECHNIKON MELETON ENGINEERING OFFICE
Equipment:4 jacks of lifting capacity 250 tons each
 
photo_of Megalorema Bridge – Egnatia Odos

Megalorema Bridge – Egnatia Odos

Location:Igoumenitsa, Greece
Construction Period:October 2015
ELEMKA Object:Repair of joints
Owner:EGNATIA ODOS SA
Contractor:AKTOR SA
Designer/Consultant:-
 
photo_of Bridge rehabilitation PK 85+674 (Β289) River Selinountas (GU29Ν)

Bridge rehabilitation PK 85+674 (Β289) River Selinountas (GU29Ν)

Location:Achaia, Greece
Construction Period:October 2015 - January 2016
ELEMKA Object:Lifting of superstructure +20cm and replacement of bearings with new antiseismic technology (triple friction pendulum)
Owner:MINISTRY OF INFRASTRUCTURE TRANSPORTATION & NETWORKS
Contractor:AKTOR SA
Designer/Consultant:DEVELOPMENT & ENGINEERING CONSULTANTS S.A. (DENCO)
Equipment:16 jacks of lifting capacity 250 tons each
 
photo_of Lifting of bridge No. 040/550-2EB/WB, Interchange 21 At Forth Ring Road, Yarmouk bridges

Lifting of bridge No. 040/550-2EB/WB, Interchange 21 At Forth Ring Road, Yarmouk bridges

Location:Kuwait
Construction Period:August 2015
ELEMKA Object:Replacement of bearings & rehabilitation of superstructure’s painting
Owner:STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS AND ROADS ADMINISTRATION
Contractor:KCPC (KUWAIT COMPANY FOR PROCESS PLANT CONSTRUCTION & CONTRACTING)
Designer/Consultant:DE LEUW CATHER INT'L LTD - PAN ARAB CONSULTING ENGINEERS
 
photo_of Lifting Of Bridge No.040/600 2WB & 2EB, Interchange 22 - Ghazali Bridge, 4th Ring-Road- East & West Branches

Lifting Of Bridge No.040/600 2WB & 2EB, Interchange 22 - Ghazali Bridge, 4th Ring-Road- East & West Branches

Location:Kuwait
Construction Period:August 2015 - September 2015
ELEMKA Object:Repair of bearings & rehabilitation of superstructure’s painting
Owner:STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS AND ROADS ADMINISTRATION
Contractor:KCPC (KUWAIT COMPANY FOR PROCESS PLANT CONSTRUCTION & CONTRACTING)
Designer/Consultant:KAWADA INDUSTRIES INC. JAPAN
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
  • Send the page
    Send the page
    x
    Sender Email:
    Recipient Email:
    Notes
    Send
  • Print Page
  • Share the page
  • AAA  font size  font size
  • File Collector
    File Collector
    x
  •  
  • Rss Feed