News

 

17 May 2012

Financial Results for the 1st Quarter of 2012 - Strong Resilience in an Adverse Economic Environment

MYTILINEOS Group posts strong financial results for the 1st Quarter of 2012, drawing on the sustained positive results of the EPC Projects sector as well as on the increased contribution from the Energy sector.
Financial Results for the 1st Quarter of 2012 - Strong Resilience in an Adverse Economic Environment (160.62KB)
DOWNLOAD PDF
 

10 May 2012

New Natural Gas Supply Agreements Signed with DEPA - Three-Year Joint Management Agreement Representing $1.4 Bn in Value

MYTILINEOS Group subsidiaries ALUMINIUM S.A., Protergia S.A. and Korinthos Power S.A. signed with the Public Gas Corporation S.A. (DEPA) new...
New Natural Gas Supply Agreements Signed with DEPA - Three-Year Joint Management Agreement Representing $1.4 Bn in Value (136.88KB)
DOWNLOAD PDF
 

02 April 2012

Commercial Operation launched for the Group’s third large Electricity Production Plant in Ag. Theodori (Korinthia)

MYTILINEOS Group obtained the commercial operation license for its 3rd combined cycle natural gas fired power plant...
Commercial Operation launched for the Group’s third large Electricity Production Plant in Ag. Theodori (Korinthia) (139.30KB)
DOWNLOAD PDF
 

28 March 2012

Extrovert Profile Boosts Growth for Mytilineos Group Exports Exceeded €1.2 Billion

In 2011, the Group posted significant growth in terms of business volumes for the second year in a row...
(214.55KB)
DOWNLOAD PDF
  • Send the page
    Send the page
    x
    Sender Email:
    Recipient Email:
    Notes
    Send
  • Print Page
  • Share the page
  • AAA  font size  font size
  • File Collector
    File Collector
    x
  •  
  • Rss Feed