Civil-engineering Project Management

Operating in a constantly changing and demanding environment, such as that of the construction sector, ELEMKA is constantly evolving. With its accumulated experience and know-how and its continued focus on high technology products and applications, ELEMKA is a consistent and reliable partner.

In parallel, the Company has expanded into the construction and management of turn-key projects, namely civil engineering projects in the energy sector, special steel structures and mechanical works.

Search Projects

photo_of 700 MW gas-fired combined cycle power plant in DEIR ALI, Damascus, Syria

700 MW gas-fired combined cycle power plant in DEIR ALI, Damascus, Syria

Location:Deir Ali, Syria
Construction Period:August 2010 - in progress
ELEMKA Object:Design, coordination and construction of civil works.
Owner:PUBLIC ESTABLISHMENT OF ELECTRICITY FOR GENERATION AND TRANSMISSION (PEEGT)
Contractor:JV ΜΕΤΚΑ SA - ANSALDO ENERGIA
Designer/Consultant:DENCO SA, AMTE SA, EDAFOMICHANIKI SA
 
photo_of 700 MW gas-fired combined cycle power plant in DEIR ALI, Damascus, Syria

700 MW gas-fired combined cycle power plant in DEIR ALI, Damascus, Syria

Location:Deir Ali, Syria
Construction Period:August 2010
ELEMKA Object:Design, fabrication and erection of steel works
Owner:PUBLIC ESTABLISHMENT OF ELECTRICITY FOR GENERATION AND TRANSMISSION (PEEGT)
Contractor:JV ΜΕΤΚΑ SA - ANSALDO ENERGIA
Designer/Consultant:DENCO SA, AMTE SA, EDAFOMICHANIKI SA
 
photo_of Design, procurement, erection and commissioning of a 436.6 MW combined cycle, single shaft power plant in KORINTHOS POWER facilities in Ag. Theodoroi, Korinthia

Design, procurement, erection and commissioning of a 436.6 MW combined cycle, single shaft power plant in KORINTHOS POWER facilities in Ag. Theodoroi, Korinthia

Location:Ag. Theodori, Korinthia, Greece
Construction Period:July 2010 - July 2011
ELEMKA Object:Design, fabrication and erection of steel works
Owner:KORINTHOS POWER
Contractor:ΜΕΤΚΑ SA
Designer/Consultant:GE POWER GENERATION
 
photo_of “Design, procurement, erection and commissioning of a 436.6 MW combined cycle, single shaft power plant in KORINTHOS POWER facilities in Ag. Theodoroi, Korinthia”

“Design, procurement, erection and commissioning of a 436.6 MW combined cycle, single shaft power plant in KORINTHOS POWER facilities in Ag. Theodoroi, Korinthia”

Location:Ag. Theodori, Korinthia, Greece
Construction Period:July 2010 - July 2011
ELEMKA Object:Erection of steam turbine and generator and alignment of the plant’s powertrain
Owner:KORINTHOS POWER
Contractor:ΜΕΤΚΑ SA
Designer/Consultant:GE POWER GENERATION
 
photo_of Construction of a steel arch railway bridge for the connection of N. Ikonio port to the rail network

Construction of a steel arch railway bridge for the connection of N. Ikonio port to the rail network

Location:West Ring Road Egaleo– Athens, Greece
Construction Period:November 2008 - November 2009
ELEMKA Object:Fabrication and erection of all steel bridges
Owner:ERGOSE SA
Contractor:JV AKTOR SA - PANTECHNIKI SA
Designer/Consultant:NESTOR LOUKATOS & ASSOCIATES SA
  • Send the page
    Send the page
    x
    Sender Email:
    Recipient Email:
    Notes
    Send
  • Print Page
  • Share the page
  • AAA  font size  font size
  • File Collector
    File Collector
    x
  •  
  • Rss Feed