Construction of the Wind Farm in the location "Pyrgos" of the municipality of Karystos, the regional unit of Evia.
The wind farm with a total power of 15.3 MW consists of 17 ENERCON-E44 wind turbines with a power of 900KW each
ELEMKA has successfully carried out the civil engineering works, including the road access network, earthworks and the foundation of wind turbines.
At the same time, specialized works was carried out to support existing excavation slopes at the project substation and to strengthen the ground of the wind turbine foundation due to extensive vertical voids and discontinuities.
Design and Construction of Wind Park Civil works (Access Road Network, Excavations and Foundation of Wind Generators)
June 2017 - April 2018
Karystos, Evia, Greece
17 Wind Generators of 0,9MW each – E44 ENERCON
15.3 MW
AIOLIKI EVIAS PYRGOS S.A.
ELEMKA S.A.