Combined Cycle Power Plant of 192MW, Ghana

ENERGY SECTOR PROJECTS (EPC)

ELEMKA has undertake the civil works for the 192MW combined cycle power plant energy project in Takoradi, Ghana.

The scope of works includes the management of the design, the coordination and the construction of civil works. The total duration time was 24 months.

Project Summary

ELEMKA's Scope:

Design, coordination and construction of civil works

Execution Period:

December 2016 - December 2019

Location:

Takoradi, Ghana

Owner:

AMANDI ENERGY LIMITED

Contractor:

JV METKA – GENERAL ELECTRIC – POWER PROJECTS LIMITED