ELEMKA has undertake the civil works for the 192MW combined cycle power plant energy project in Takoradi, Ghana.
The scope of works includes the management of the design, the coordination and the construction of civil works. The total duration time was 24 months.
Design, coordination and construction of civil works
December 2016 - December 2019
Takoradi, Ghana
AMANDI ENERGY LIMITED
JV METKA – GENERAL ELECTRIC – POWER PROJECTS LIMITED