OAKA – Velodrome, repair – maintenance – waterproofing works on the interior roof & wooden track
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertakes the construction of a steel bridge structure, with a total length of 18m, in the area “Alli Meria” in Volos. The project includes the construction of a road bridge, an arch steel structure supported on concrete abutments with cast in – place concrete caps.
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertook the design, restoration and execution of reinforcement works for the swimming pools at OAKA.
Read MoreELEMKA undertakes the execution of works, which include the extension and conversion of the existing central building...
Read More