JULY 30 2020

COMPLETION OF INSPECTION WORK ON A STEEL HANGAR IN SAUDI ARABIA.

Inspection works have been completed on a 12,000 m2 steel hangar in Riyadh, Saudi Arabia. 

The inspection works concerned the static adequacy check of the steel structure with deliverable the evaluation report containing the proposal for its repair and maintenance.

Change cookies consent Revoke cookies consent