OAKA – Velodrome, repair – maintenance – waterproofing works on the interior roof & wooden track
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertakes the "Smart Bridges" project which involves the instrumented monitoring of 250 railway & road bridges nationwide. The scope of ELEMKA is divided into two phases.
The 1st phase concerns the conduct of the primary inspection and the issuance of the relevant report including the surveying of the bridges, the findings of the inspection and the production of the 3D model.
The 2nd phase includes the transport, installation, assembly and commissioning of (RTSHM) instrumental structural health monitoring systems on each bridge, along with the installation of a stand-alone electrical power supply system to operate the RTSHM system.
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertook the design, restoration and execution of reinforcement works for the swimming pools at OAKA.
Read MoreELEMKA undertakes the execution of works, which include the extension and conversion of the existing central building...
Read More