OAKA – Velodrome, repair – maintenance – waterproofing works on the interior roof & wooden track
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertakes the construction of the 2nd production line in existing factory of a multinational company in the industrial area of Parma in Italy.
The project includes the static design, supply of materials, fabrication and erection of the steel platforms with an area of ~2.000m2 as well as that of the installation of the piping network and the mechanical connection of the machinery-equipment with an estimated completion schedule of 7 months.
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertook the design, restoration and execution of reinforcement works for the swimming pools at OAKA.
Read MoreELEMKA undertakes the execution of works, which include the extension and conversion of the existing central building...
Read More