OAKA – Velodrome, repair – maintenance – waterproofing works on the interior roof & wooden track
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertakes the early works for the construction of two building complex in Hellenikon Metropolitan Pole, owned by Hellinikon S.M.S.A..
The scope of works includes the construction of two building complex with total area 16.000 m2. The first is compromised of three buildings and reaching heights of 5 floors with common basement placed in such way to take advantage of the sea view. The second complex is distributed in three buildings.
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertook the design, restoration and execution of reinforcement works for the swimming pools at OAKA.
Read MoreELEMKA undertakes the execution of works, which include the extension and conversion of the existing central building...
Read More