OAKA – Velodrome, repair – maintenance – waterproofing works on the interior roof & wooden track
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA is undertaking the construction of a new industrial building, part of the extension of METLEN’s factory, within the 1st Industrial Area in Volos.
The project involves the construction of a steel building (concrete foundation – steel structure/frame – concrete slab on grade – panels), which extends to around 8.200 m2 and its maximum height reaches 14m. The scope of work also includes the procurement and installation of special steel structures, electrical and mechanical equipment, networks, finishing works, the construction of a perimeter fencing wall and the formation of new roads and surroundings. The project budget comes up to approximately 16.000.000 €.
ELEMKA undertook the intervention, repair, and waterproofing works on the roof and the track of the Olympic Velodrome...
Read MoreELEMKA undertook the design, restoration and execution of reinforcement works for the swimming pools at OAKA.
Read MoreELEMKA undertakes the execution of works, which include the extension and conversion of the existing central building...
Read More