Construction of new three story residence, HELLINIKON
ELEMKA undertakes the Construction of new three story residence
Read MoreELEMKA undertakes the "Smart Bridges" project which involves the instrumented monitoring of 250 railway & road bridges nationwide. The scope of ELEMKA is divided into two phases.
The 1st phase concerns the conduct of the primary inspection and the issuance of the relevant report including the surveying of the bridges, the findings of the inspection and the production of the 3D model.
The 2nd phase includes the transport, installation, assembly and commissioning of (RTSHM) instrumental structural health monitoring systems on each bridge, along with the installation of a stand-alone electrical power supply system to operate the RTSHM system.
ELEMKA undertakes the Construction of new three story residence
Read MoreELEMKA is undertaking the construction of Steel Shelters in the outdoor area of the Regency Casino in Thessaloniki
Read MoreELEMKA is undertaking the construction of a new industrial building, part of the extension of METLEN’s factory, within the 1st Industrial Area in Volos.
Read More