Inspection and Monitoring

The purpose of the inspection of the structures and the infrastructure in general, is to reveal any defects and operational problems, areas of tension and loads not permitted by design, as well as possible sources which are creating future problems.

The monitoring with the use of special measuring instruments, such as accelerometres, micrometres and special transmitters, aims to record the real behaviour of a technical project in operational and seismic conditions, even in real time. In this way, the correct and efficient maintenance of the project is achieved with interventions in the areas that need immediate repair, the maintenance cost is reduced, the operating period is extended as well as the investment of the construction is ensured.

In parallel, the monitoring during the construction allows the continuous and on-site recording of the structure behaviour in real conditions, contributing to the improvement of the design, the upgrade and evolution of the specifications and regulations, as well as to the selection of the optimal methodology of the construction.

Electric Railway Poulopoulos Bridge – Thisio

Location: Athens, Greece
Execution Period: February 2015
ELEMKA's Scope: Inspection of bridge elements
Owner: URBAN RAIL TRANSPORT S.A. (STA.SY)
Contractor: ELEMKA S.A.

Bridges C3 & C12, Underpasses U1 & U3, Riyadh, Saudi Arabia

Location: Riyadh, Saudi Arabia
Execution Period: January 2015
ELEMKA's Scope: Inspection of bridge elements
Owner: MUNICIPALITY OF RIYADH
Contractor: ELEMKA S.A.

Akrotirion, Santorini Archaeological Site Canopy

Location: Santorini, Greece
Execution Period: October 2014
ELEMKA's Scope: Inspection of the canopy bearings
Owner: ARCHAEOLOGICAL COMPANY OF ATHENS
Contractor: AKROTIRIO THIRAS J/V

4th Ring Road, Int. 22, Ghazali Bridge, Kuwait

Location: Kuwait
Execution Period: June 2014
ELEMKA's Scope: Inspection of bridge elements
Owner: STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS, ROADS & BRIDGES MAINTENANCE DEPARTMENT, MAINTENANCE ADMINISTRATION
Contractor: COMBINED GROUP

Elefsina-Korinthos-Patra-Pyrgos-Tsakona Highway, Ladopotamos, Bouraikos, Kerinitis Bridges

Location: Greece
Execution Period: February 2014 - March 2014
ELEMKA's Scope: Inspection of bridge bearings
Owner: MINISTRY OF INFRASTRUCTURE, TRANSPORTATION AND NETWORKS
Contractor: AKTOR S.A.

Roditsa Motorway, PATHE Motorway

Location: Greece
Execution Period: October 2013
ELEMKA's Scope: Inspection of bridge bearings. Structures T7, T5Δ, Τ1Δ, Τ2, Τ9Α & Τ9Δ
Owner: MINISTRY OF INFRASTRUCTURE, TRANSPORTATION AND NETWORKS
Contractor: PORTO KARRAS S.A.

4th Ring Road, Int. 21, Yarmouk Bridge, Kuwait

Location: Kuwait
Execution Period: July 2013
ELEMKA's Scope: Inspection of bridge elements
Owner: STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS, ROADS & BRIDGES MAINTENANCE DEPARTMENT, MAINTENANCE ADMINISTRATION
Contractor: KCCEC (KCC ENGINEERING & CONTRACTING CO.)

Road No. 30, Int. 72, Bridge F-11 & 072/300, Kuwait

Location: Kuwait
Execution Period: April 2013
ELEMKA's Scope: Inspection of bridge elements
Owner: STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS, ROADS & BRIDGES MAINTENANCE DEPARTMENT, MAINTENANCE ADMINISTRATION
Contractor: ELEMKA S.A.

King Faisal Road, Int. 23 & 23C, Bridge No. 080/500, Kuwait

Location: Kuwait
Execution Period: December 2012
ELEMKA's Scope: Inspection of bridge elements
Owner: STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS, ROADS & BRIDGES MAINTENANCE DEPARTMENT, MAINTENANCE ADMINISTRATION
Contractor: KCC ENGINEERING & CONTRACTING CO.

5th Ring Road, Int. 39, Bridge 500/050, Kuwait

Location: Kuwait
Execution Period: October 2012
ELEMKA's Scope: Inspection of bridge elements
Owner: STATE OF KUWAIT - MINISTRY FOR PUBLIC WORKS, ROADS & BRIDGES MAINTENANCE DEPARTMENT, MAINTENANCE ADMINISTRATION
Contractor: KCC ENGINEERING & CONTRACTING CO.