New 7-storey hotel with preservation of existing building facades, Athens
ELEMKA has undertaken the construction of a 7-storey hotel with preservation of existing building facades
Read MoreCompletion of the inspection and evaluation of all Electromechanical networks at the container terminal at Duba Port , KSA within a period of one month during the imposition of restrictive measures due to COVID-19 in the Kingdom.
ELEMKA successfully completed the project which included the inspection and evaluation of the Electromechanical installations at the terminal of "Duba Port", by examining the installed networks of the medium and low voltage, drinking water, sanitation and firefighting as well as the delivery of the final evaluation report. The company has been able to carry out a particularly demanding task, considering the additional difficulties due to the restrictions and the safety measures imposed due to the pandemic.
ELEMKA has undertaken the construction of a 7-storey hotel with preservation of existing building facades
Read MoreELEMKA has undertaken the construction of a modern residential complex
Read MoreELEMKA undertakes the Construction of new three story residence
Read More