MARCH 31 2020

COMPLETION OF WORKS FOR THE ‘’POUNTA’’ WIND PARK

The works for the Wind Park at the "Pounta" location of the Municipality of Kymi - Aliveri in the regional unit of Evia have been completed. The 11 MW Wind Park consists of 6 wind turbines, of which 4 are of ENERCON E-52 type with a capacity of 2.3 MW each and 2 are of ENERCON E-44 type with a capacity of 0.9 MW.

ELEMKA successfully completed the civil works including the road access network, the excavations and the foundation of the wind turbines.

09/30/2021
Reconstruction of buildings in Kavouri, Attica.

ELEMKA undertakes the reconstruction of buildings with the addition of steel and composite elements, maintaining the frame and the volume of the buildings in Kavouri area, Municipality of Vouliagmeni in the Prefecture of Attica.

Read More
Change cookies consent Revoke cookies consent